Our Projects

HOTR8
HOUSE ON THE ROCK CATHEDRAL, LEKKI – LAGOS
2010
WhatsApp Image 2020-05-12 at 2.00.32 PM
DEVELOPMENT OF 8 BLOCKS OF 3-BEDROOM DETACHED BUIL...
2018
IMG-20151226-WA0002
PRINCE EBEANO SUPERMARKET, LEKKI – LAGOS
2016
AmazingGrace1
Amazing Grace II Towers, Ikoyi for The Amazing Gra...
2018
DCIM100MEDIADJI_0768.JPG
Heritage Gardens Estate, Lekki for Chevron Employe...
2018
RPE 3d2
Ridge Park Estate, Lekki for Chevron Employees Mul...
2018
Screenshot 2020-01-07 at 23.33.14
BANWO & IGHODALO LAW FIRM HEADQUARTERS
2016
Friesland Campina Wamco2
FRIESLAND CAMPINA WAMCO FACTORY EXTENSION
2016
Screenshot 2020-01-07 at 23.53.30
Command and Control Center at CBC Towers Lekki, La...
2013

Ongoing Projects

ADYD'S HAVEN,
22 Pelewura Crescent, Apapa, Lagos

CLIENT: The Builders in conjunction with LSDPC.

PROJECT DATE: 2022

 

Scope of Work:

–  Residential Development

–  3nos 3-Story blocks

–  Excavation and Earthworks

–  Framed Structure (Concrete, Reinforcement, Formwork)

–  Staircases (Concrete, Reinforcement, Formwork)

–  External and Internal Walls

–  Roof Carcass and Covering

–  Felt work

–  Aluminum Windows

–  Timber Doors

–  MEP Installations

–  Finishes (Walls, Floors and ceiling)

Facts and Figures:

Project Duration: 10 months

Completion Date: June 2023

 

KING’S COURT ESTATE, Abijo, Lagos

CLIENT: Chevron Employees Multipurpose Cooperative Society

PROJECT DATE: 2021

Scope of Work:

– Infrastructure Development for the 17Ha greenfield project.

– Site preparation and land reclamation with over 200,000m3 imported sharp filling sand.

– Construction of 3,7km Asphalt Roads, Concrete Drainages and Walkways.

– Construction of a 10,000m2 footprint Community Center.

– Installation of 900m3 Ground Water Storage Tank, 96,000L Overhead Portable Water Tank, 6km of underground HDPE Portable Water Pipe network with up to 250mm diameter pipes.

– 3km of underground schedule 40 Black steel Fire hydrant Pipe network with 24nos Fire hydrant pillars, Diesel/Electric/Jockey Fire Water Pump, etc.

– Installation of 2no each of 300KVA duty & standby diesel-powered generator sets, 134nos Streetlights, Underground cable network for entire site, 7nos Feeder Pillars, 7nos Substations, HT transformers and Panels, 30nos CCTV Cameras etc.

Facts and Figures:

Total Floor Area: 170,000 m2

Total Estate Occupancy

Load: 5,800 persons

Total Man-hours: 1,123,200hrs

Project Duration: 18 months

Completion Date: 30th June 2023

GARNET RESIDENCES,
37-41 Sinari Daranijo Victoria Island, Lagos

CLIENT: Patrick Ogunjobi & Co in conjunction with LSDPC

PROJECT DATE: 2022

Scope of Work: 

–  Residential Development

–  15 units of 2 bedroom flats with BQ on 5 suspended Floors

–  4 units of 4 Bedroom Terraced duplexes with BQ  on 2 suspended floors

–  2 units of 4 Bedroom Semidetached Duplexes with BQ on 2 Suspended Floors

–  Excavation and Earthworks

–  Framed Structure (Concrete, Reinforcement, Formwork)

–  Staircases (Concrete, Reinforcement, Formwork)

–  External and Internal Walls

–  Roof Carcass and Covering

–  Feltwork

–  Aluminium Windows

–  Timber Doors

–  MEP Installations

–  Finishes (Walls, Floors and Ceiling)

Facts and Figures:

Project Duration: 10 months

Completion Date: June 2023

AMAZING GRACE TOWERS
2, Ikoyi, Lagos

CLIENT: The Amazing Grace Insight Properties Limited

PROJECT DATE: 2017

Scope of work:

– Block A Main Building (Nine Story Building). A Block 17 No. Apartments.

– Block B Main Building (Eight Story Building). A Block of 9 No. Apartments.

– Adjoining Building: Cabana & Swimming Pool.

– Ancillary Building: Security House & Generator House

– External Works & Drainage.
– Services Installations (First Fixes).

Facts and figures:

Project Duration: 24 Months
Completion Date: June 2020

HERITAGE GARDEN ESTATE,
Lekki, Lagos.

CLIENT: Chevron Employees Multipurpose Cooperative Society

PROJECT DATE: 2018

Scope of work:

– Construction of 3.5km Asphalt Roads, Concrete Drainages.

– Construction of a 10,500m2 Footprint Commercial Center.

– 900 Seater Event Center

– 1,000m2 of Offices & Seminar

– 1,500m2 of Retail Space Court, Multi-Sports Court

25m x 25m Swimming Pool, Paddle Pool and Pool House

Standard Tennis Court & 5-Aside Futsal Pitch

– Installation of 840m2 FRP Surface Portable Water Storage Tank

– 110m3 Overhead Portable Water Tanks.

– 3.2km of Underground HDPE Portable.

– Portable 3km of Underground Schedule

– 40 Black Steel Fire Hydrant Pipe Network

– Installation of 3nos 250KVA Generator Set, 250 Streetlights

– 42nos Feeder Pillars, 5nos Substations, HT Transformers and Panels

Facts and Figures:

Total Floor Area: 23,000m2

Total Estate Occupancy Load: 5,800 persons.

Total Man-hours: 1,123,200hrs

Project Duration: 18months

Completion Date: 30th March, 2020

TWINLAKES ESTATE, Ajah

Scope of Work:

– Site Clearance and Earth Works (Road, Drainage and Walkway)

– Concrete and Kerb Works Building (Road, Drainage and Walkway)

– Pavement Work, Line Markings & Painting (Road & Kerb)

– Road and Street Lighting System

– TLE x NCF Boundary Perimeter Fence Wall (1-980.0m)

– AISL x TLE Security Fence (Wall “D” Gate House #5)

Fact and Figures

Project Duration: 9 Months

Completion Date: June 2016

RIDGE PARK ESTATE

CLIENT: Chevron Employees Multipurpose Cooperative Society

PROJECT DATE: 2019

Scope of work:

–  Site preparation and land reclamation with over 200,000m3 imported walkways.

–  Construction of 1.5km Asphalt Roads, Concrete Drainages and Walkways.

–  Construction of a 900m2 footprint Community Center with the following:

 * Gymnasium.
 * 319m2 of Facility
 Management Offices and
 Conference room.
 * Lounge, Indoor Games
 area.
 * Car park.

– Installation of 270m3 Ground Water Storage Tank, 84,000L Overhead Portable Water Tank, 1.5km of underground HDPE Portable Water Pipe network.

– 1.2km of underground schedule 40 Black steel Fire hydrant Pipe network with 15nos Fire hydrant pillars, Diesel/Electric/Jockey Fire Water Pump, etc.

– Installation of 1no each of 200KVA duty & 150KVA standby diesel powered generator sets, 100nos Streetlights, Underground cable network for engine site, 6nos Feeder Pillars, 2nos Substations, HT transformers and Panels, 15nos CCTV Cameras, etc.

 

Facts and Figures:

Total Floor Area: 87,000m2

Total Estate Occupancy

Load: 2,250 persons

Total Man-hours: 249,600hrs

Project Duration: 13months

Completion Date: 30th March 2020